RainbowRainbow Group ERP
Discovery playback  ·  Revised after your feedback
Discovery playback

What we heard, and what your feedback changed

Rebuilt after your written feedback, your CRM tracker terminology, your admission forms, checklists and receipts, and the visitor screens from your current system. Where you corrected us, the correction is marked. Where an answer is still open, it is marked as open rather than guessed.

Prepared by
Eiosys Private Limited
Scope
Core, Sales and Marketing, Admission
Business units
RPS and RIS
Still open
Four questions, on the last slide
01, Your corrections

Eight things your feedback changed

Listing these first, because a playback is only useful if it shows what was wrong. Each is carried through every slide that follows.

Corrected

One company, many business units

Rainbow Group is the brand. Rainbow India Ltd is the company, and it sits above both business units.

Corrected

One business unit per branch

A branch belongs to one unit. RPS and RIS run at separate locations with separate staff.

Corrected

Grade does not decide the unit

Grade is many to many with business unit. The counsellor selects the unit when starting an admission.

Corrected

The child record never changes

Numbers are reissued on a move. The child underneath them is permanent, with full history kept.

Corrected

Provisional holds no seat

It records intent and money received, but does not block capacity and never cancels itself.

Corrected

Login is the enrollment number

One account per child, not per family. Parents move between siblings and between years.

Corrected

Communication is per business unit

RPS and RIS each carry their own identity. Head office never contacts parents directly.

Corrected

Happy Times is a grade

Held in the grade master as a service, with its own billing head, kept out of school revenue.

Several of these reverse what we presented last time. Branches hosting more than one unit, grade determining the unit, provisional admission holding a seat, and parents logging in by mobile number were all in the previous version. They are gone, and this deck is built on the corrected model rather than patched over the old one.
02, Organisation

Organisation, country, company, business unit, branch

Five levels, in that order. The distinction that matters most is the first pair: Rainbow Group is a brand and not a legal entity, while Rainbow India Ltd is the company that employs staff, pays salaries, holds vendor relationships and raises purchase orders.

L1Organisation
Rainbow GroupThe brand. One platform, one academic year calendar as the base that every cycle anchors to
L2Country
IndiaCurrency, statutory rules, state and city masters, and the document requirements that vary by country
Further countriesSupported, including right to left languages
L3Company
Rainbow India LtdThe legal entity. Payroll, vendors, suppliers, purchase orders and assets sit here. One company holds many business units, and further companies can be added without disturbing anything below
L4Business unit
RPSPlay Group to Grade 4, with Happy Times as a service grade. Own registers, number series, receipt terms and communication identity
RISNursery to Grade 12, CBSE, streams from Grade 11
L5Branch
Each branch belongs to one unitHariniwas is an RPS branch, Brahmand is an RIS branch. The two schools run at separate locations with separate staff
Head officeA corporate branch, with no business unit and no students
Head office without a unit of its own. A National Sales Head belongs to neither RPS nor RIS but needs to see both. Rather than inventing a third unit with no students, head office staff sit on a corporate branch and their reach is granted by their role. The same mechanism already handles a Branch Manager seeing one branch and a Director seeing many.
03, Business units

Where RPS and RIS overlap, and who decides

Nursery through Grade 4 exist in both units. A grade therefore cannot tell the system which school a child is joining, so grade is held as many to many with business unit, and the counsellor selects the unit when the admission is started.

RPS Play GroupNurseryJr KGSr KG Grade 1Grade 2Grade 3Grade 4 Happy Times
RIS NurseryJr KGSr KG Grade 1Grade 2Grade 3Grade 4 Grade 5 to 10Grade 11 and 12

Highlighted grades exist in both units. One grade record, mapped to both, rather than two separate records with the same name.Exact master to confirm

A choice of location, not a comparison

Because RPS and RIS run at different addresses with different staff, a parent enquiring for an overlapping grade is choosing where to send their child rather than weighing two schools at one campus. The counsellor records which unit the enquiry belongs to at the start.

The unit drives everything downstream

Fee structure, document checklist, number series, receipt terms, approval chain and communication identity all follow from the unit selected at the start of the enquiry.

Streams and the integrated option

Grade 11 and 12 carry Science, Commerce and Humanities. The integrated option applies across all three, for students preparing for competitive examinations who attend mainly for their examinations. Grade 11 also takes external intake with academic screening.

04, Academic structure

Academic year, grade, division, student

Division replaces section throughout, per your correction. A grade is the year of schooling. A division is one class of that grade at one branch, with its own capacity, class teacher and roll numbers. Your receipts already print the pair as Nursery >> A and Class I >> B.

A1Academic year
2026 to 2027One global calendar. Admissions, capacity, fee cycles, targets and reporting all anchor to it
A2Grade
Mapped to business unitsMany to many, with the overlap on the previous slide and Happy Times held as a service grade
A3Division
Nursery AOne branch, own capacity and roll numbers
Nursery B
Grade 1 B
A4Enrollment
One record per child, per yearYear, grade, division, roll number and status recorded fresh each year. This is what lets you answer how many children were in Grade 1 in 2027, years after the fact

Capacity by grade and division

Entered per grade and per division. The second division opens only once the first is full.

Gender-wise capacity

Also held by gender within a division, as a warning rather than a block. A counsellor may proceed with a reason recorded.

Cancelled seats fill first

A new admission takes a seat freed by a cancellation before any additional capacity is opened.

Provisional holds nothing

A provisional admission does not block capacity, so a held seat is never lost to a family who never completed.

05, Student identity

Numbers change, the child does not

This is the design that lets you reissue GR and enrollment numbers on a move without ever losing the child underneath them. It answers sibling matching, prior admissions, and how many of your intake came from your own preschool.

Child master

Permanent, and never changes. Created once and kept for life. It survives branch transfer, movement between business units, cancellation and re-admission. Everything else attaches to it.

Enrollment

Many per child, with exactly one active at any time. Each carries its own academic year, grade, division, roll number and status. A new admission creates a new one and retires the last.

Number history

Every enrollment code and GR number the child has ever held, with the date of each change and the reason for it. Nothing is overwritten, so a number printed on a receipt three years ago still resolves to the right child.

Siblings

Linked manually by your staff through a siblings table. Links hold across business units and branches, so a child in RPS Nursery and a sibling in RIS Grade 3 are connected.

Period Where GR number Enrollment code Status
2025 to 2026 RPS Hariniwas, Nursery 2025-26/RPSHN/10 25HN0010 Retired
2026 to 2027 RPS Manpada, Jr KG 2025-26/RPSHN/10 26MP0044 Retired
2027 to 2028 RIS Brahmand, Grade 1 2027-28/RIS/210 27RIS0210 Active
Read the middle row. A branch transfer keeps the GR number and issues a new enrollment code, so the GR still reads Hariniwas while the child sits at Manpada. That is intentional: the GR records where the child started rather than where they are now. The bottom row is a move to RIS, where both numbers are reissued and the source is recorded as RPS. In all three, the child is one record.
06, Happy Times

A grade for enrolment, a separate head for money

Extended care for working parents, around eight hours a day, inside RPS. Held in the grade master so teachers, children and attendance work exactly as they do for any other grade, with its billing kept deliberately apart.

Managed as a grade

Children enrol, teachers are assigned, divisions carry capacity and attendance is taken. Everything the platform already does for Nursery applies here with no special handling.

Billed on its own head

A separate account head and receipt series on a quarterly cycle, running from the date of admission to the end of the third month. A parent joining on 10 August is covered to 30 October, not to 10 November.

Kept out of school revenue

Service income reports separately, so an admissions figure or a school fee figure never quietly includes extended care money.

Two enrolments, one child. A student may hold one academic enrolment and one service enrolment in the same year, or a service enrolment on its own for a child who comes only for extended care. That is what lets a Nursery child who stays until the evening be recorded once as a child rather than twice, and it means every count downstream stays right.
Same shape, later

Summer Camp and others

Anything a family opts into that is not a school year fits the same pattern: a service grade with its own dates, capacity, billing head and receipt series. Since pricing is already held per grade, adding one is configuration rather than development.

Its own closure reason

Your existing reason Day Care becomes Happy Times, so an enquiry that ends in extended care rather than a school admission is recorded as exactly that.

07, Who sees what

Access is decided at the branch, and narrowed for teachers

Principals, vice principals and sales staff at a branch work across everything there, so the branch is the boundary. Reaching another branch, or the whole group, is granted by the role rather than assumed. Teachers are narrowed further, to their assigned divisions.

Dimension 1

Domain

Academics, Admissions, Sales, Marketing, Administration, HR, Accounts, IT.

Dimension 2

Department

The unit inside a domain. Preschool, Primary, Secondary, Talent Acquisition, Payroll.

Dimension 3

Authority level

Seniority as a number. Approvals, escalations and turnaround times all follow it.

Dimension 4

Reach

Whole group, one business unit, one branch, one department, assigned divisions only, or own records only.

Chain

Sales

National, Zonal, Regional and Area Heads at head office. Below them, Relationship Associate reporting to Chief Advisor at the branch.

Chain

Marketing

Three levels. CRM Executive for offline marketing, then Relationship Associates, then juniors. Budgets set at head office.

Chain

Academic

A Director of Academics below two Principals. RPS escalations reach the Branch Manager, RIS escalations reach the Sales Lead.

Your forms already record the approval chains. The RIS admission form is signed by Admission Associate, Branch Head and Director Academics. The Grade 11 form is signed by Admission Associate, School Manager, Principal and CEO. Different documents, different chains, both configured by authority level rather than fixed in code. The same control governs who may create or edit a reason master.
08, The parent journey

One record from first enquiry to first day

Every stage is one continuous record, so the source that produced the enquiry is still attached when the admission completes. Ownership passes between your teams, the record does not restart.

01

Enquiry arrives

Website, Google, Meta, WhatsApp, referral, tie-up, event or walk-in. Checked against existing leads before anything else.

System
02

Unique or duplicate

A new family becomes a lead. A repeat becomes a linked duplicate event on the original.

System
03

Allocated

Unit and grade confirmed, scored, then assigned by rotation and current workload, with manual override.

CRM Executive
04

Walk-in booked

First contact within 24 hours. Visit booked into a real slot against branch timings and holidays.

RA
05

Walk-in completed

Front desk registers the parent, RA meets them, counselling, tour and fee discussion.

Front Desk, RA
06

Provisional

Optional. Intent and a token amount recorded while documents are still coming.

RA, Approver
07

Admission done

Documents verified and signed off, payment complete, enrollment code and GR number issued.

System
Every admission begins with a lead. There is no direct admission path, so the source that produced a family is always recoverable. Movements between branches and business units are the one exception, since they are internal and never enter the funnel.
09, Lead status

Your CRM tracker terminology, kept as it is

Taken directly from your existing RPS and RIS trackers, which you have asked to be the operational reference. The expanded status list we proposed earlier is dropped, including Visited.

Main path OPEN WALKIN BOOKED WALK-IN COMPLETED ADM DONE
Dropped CLOSEDbefore the walk-in CLOSED AFTER WALKINafter the walk-in
Other FUTURE PROSPECTheld against a year range, raised when that year opens TRANSFERREDbranch or business unit movement

The year is a field, not a status

Each lead carries its academic year separately, so the status master never fills up with year-tagged variants and stays the same list from one intake season to the next.

Simple in front, complete behind

Teams see the short list. The system still records every status change with date, time, previous value, new value and the user, plus calls, follow-ups, booking and completion dates, closure, reopening and duplicate history.

Closing has a floor

Three calls, two WhatsApp messages and one email are required before a lead may be closed as not interested. The system enforces it rather than trusting it happened.

Closure reasons are mandatory, and they are yours. A lead cannot be saved as closed without one, and blank or No Remark is not selectable. We will take the final list from your live CRM sheets rather than inventing one, each business unit can carry its own, and only roles with the right permission may create or edit the master.
Did Not EnquireHigh FeesLocationDistance Admission Done, Other SchoolNot InterestedJob EnquiryInvalid DuplicateRainbow ParentNo ResponseNo Seats Continuing with Current SchoolSpecial NeedsAfter School ActivitiesHappy Times Board PreferenceTransfer to RISTransfer to RPSPromotionalHostel School
10, Duplicate enquiries

Every touchpoint captured, one lead counted

The change you asked for specifically. A parent may enquire through Meta, then Google, then the website, then WhatsApp. All four are recorded. Only the first is a lead.

Stays as it is

The original lead

Keeps its Lead ID, its first source, its date and time, its assigned Relationship Associate and its status. The first source is never overwritten, so first touch attribution stays intact.

New record, not a new lead

The duplicate event

Its own event ID, its own source, campaign, date and time. Recorded against the original lead. Counted in submissions and in marketing analysis, never in unique leads.

What the duplicate tab shows

Original lead ID and duplicate event ID, parent and student name, mobile, email, business unit, branch, grade, original source with date and time, duplicate source with date and time, campaign and tracking values, time between the two, how many times this family has come in, which field matched, the assigned RA and the current status of the original.

The window resets each year

A family that enquired last year and enquires again for the next intake is a genuinely new lead, not a duplicate. Detection runs within an academic year, so your unique count stays honest across seasons.

Up to three sources

Each family carries a primary, secondary and third source. For a direct walk-in the second level of the source tree covers organic, sibling, telephonic and word of mouth.

What your dashboard will separate. Total enquiry submissions, unique leads, duplicate leads, open, walk-ins booked, walk-ins completed, admissions, closed, closed after walk-in, future prospects and transfers. Duplicate percentage is readable by source, campaign, branch, date, time and business unit.
11, Two chains

Marketing and admission meet at exactly one point

They are measured differently and owned by different teams. Marketing works in campaigns and money, with no individual person involved. Admission works one family at a time. Everything you want to know about return on spend depends on the join between them holding.

Marketing chain

Head office

Counted in totals per campaign and per day. No individual identity exists here.

Budget per academic year, revised monthly, approved where you require it
Channel from Google, Meta, offline presence, or events
Spend pulled automatically for Google and Meta, entered by hand for billboards, buses, print and events
Reach as views and clicks per campaign

Admission chain

Branch

Counted one family at a time, with a named owner and a next action at every step.

Open, scored and allocated to a Relationship Associate
Walk-in booked, then completed, with revisits counted separately
Provisional, where intent and a token amount are recorded
Admission done, or closed with a recorded reason
The join. A lead created from an advertisement carries the campaign it came from, so spend on the left divides by outcomes on the right. That gives cost per lead, cost per booking, cost per walk-in and cost per admission, readable by campaign, branch and business unit. Targets are fed in alongside, so achievement is tracked against actual admissions rather than counted at year end.
What we need from your web team, and it cannot be added later. Your enquiry form must pass the campaign tracking values through at the moment a parent submits it. Without that we can report that a month of Google spend produced a number of enquiries, but never which advertisement produced a particular admission. For offline, giving each billboard, bus route and event its own QR code or number is what makes cost per admission meaningful there too.
12, Provisional admission

Intent recorded, before the numbers are issued

A confirmed stage in its own right, switched on or off per business unit. It exists for the real case where a family is committed and has paid something, but the paperwork is not finished.

Stage 01

Walk-in completed

Counselling and tour done, fee discussed, family intends to proceed.

Stage 02, optional

Provisional admission

Token amount or first instalment received. Documents still outstanding. Recorded against the lead.

Stage 03

Completion

Documents verified and signed off, balance received, post dated cheques or mandate secured.

Stage 04

Admission done

Enrollment code and GR number issued. Only now does the student record exist.

Holds no seat

Capacity is not blocked. A family who never completes cannot quietly occupy a place that another child could have taken.

Issues no number

No GR number and no enrollment code. Those are reserved for a completed admission, so your registers stay clean.

Never cancels itself

There is no automatic cancellation. Refunds and returning original documents need a person, so a person decides.

Sits on a worklist

Every long pending provisional admission is listed with its age, what has been received and what is outstanding, with a cancel action when your team is ready to use it.

Why no automatic cancellation. Cancelling a provisional admission means returning a token amount and handing back original certificates, and both need a checklist and a human. An automatic sweep would silently create refund obligations nobody had reviewed. The worklist gives your team the same visibility without that risk, and finance gets a standing report of everything received against admissions that have not yet completed.
13, Documents

A document module, not a checklist per form

Read from your RIS admission form, your Grade 11 form, your registration form and both checklists. Documents become a master in their own right, mapped to business units, so the same document means the same thing wherever it appears.

Defined once, mapped many times

Each document exists once in the master, then is mapped to a business unit and grade with its own mandatory or optional flag. Requirements also vary by country, which the master already allows for.

Approved as a set, not one by one

Verification happens at checklist level, exactly as your paper form works: counsellor's signature, then checked by, then approved by. Individual documents carry their own status, but no individual approval step.

Signed off digitally

Once the set is complete, a senior role verifies and applies a digital signature. The signature applies to the completed process, not to a single upload. Final verification sits with a head office role.Role to name

Different lists, same machinery

RIS asks for three photographs, student and both parents' Aadhaar, transfer certificate, birth certificate, marksheet, address proof, post dated cheque and a migration certificate on a change of board. RPS asks for two photographs, birth certificate, residential proof, Aadhaar and last report card. Grade 11 adds a post dated cheque for the following year.

Pending documents chase themselves

Reminders go to the parent automatically against a defined turnaround time, with the pending list and due date held on the record rather than in someone's memory.

An approval matrix where it is needed

Which roles verify and sign off is configured per business unit rather than fixed, so RPS and RIS can differ without a change to the software.

Gate 01

Documents verified

Checklist complete, approved and digitally signed. An incomplete set blocks completion.

Gate 02

Payment received

Recorded with a receipt from the correct business unit series.

Gate 03

Future payment secured

Post dated cheques or an eNACH mandate, per your own terms.

Gate 04

Finance confirmed

Reconciled and confirmed by the authorised user before the admission closes.

14, Movements

The four routes that are not new admissions

Each looks like an admission and none of them is one. None creates a lead, and none appears in your conversion funnel. What changes is which numbers are reissued, and in every case the child record underneath is untouched.

Movement Child GR Enrollment Roll How it works
In-house rollover unchanged unchanged unchanged new Promotion to the next year. A mini fee payment confirms the family is continuing, then the administrator assigns grade and division. Documents carry forward where they still apply.
Branch transfer unchanged unchanged new new Within the same business unit. Cancelled at the old branch and admitted at the new one. The GR travels with the child, so it continues to name the branch where they started.
RPS to RIS, or reverse unchanged new new new Cancelled in one unit and a fresh admission created in the other. Both numbers are reissued and the source is recorded as RPS or RIS accordingly.
Cancellation unchanged retired retired released Numbers are retired permanently and never reused. The seat returns to the pool and is filled before any new capacity is opened.

Rollover is two steps, deliberately

The financial step and the academic step are separate. A mini fee payment confirms the family is returning, and only then does the administrator place the child in a grade and division. That ordering is what stops a class list filling up with children who have not actually come back.

Nothing is lost on a move

Because the child record is permanent and every number the child has held is kept with its date and reason, a move between units reissues numbers without breaking sibling links, prior admissions, or the question of how many of this year's Grade 1 intake came from your own preschool.

A note on the GR number after a branch transfer. A student who moves from Hariniwas to Manpada keeps 2025-26/RPSHN/10, which still reads Hariniwas. That is by design and confirmed by you: the GR records where the child started rather than where they currently sit. Worth stating plainly, because in two years someone will find that number and think it is a mistake.
15, Parent app

One account per child, and a way between them

Two applications: one for parents, one for teaching and branch staff. The parent app signs in with the child's active enrollment number, which means shared family phone numbers never collide.

Screen 01

Sign in

The child's active enrollment number is the identifier. No mobile number, so both parents may use the same account and a shared number is never a conflict.

Screen 02

This child

Everything for one child. A parent can also move between academic years to see previous grades, divisions and history.

Screen 03

Siblings

Children your staff have linked appear here, including across business units and branches.

Screen 04

Switching

Choosing a sibling signs the parent out and returns to the sign-in screen with that child's enrollment number already filled in.

The account outlives the number

The account attaches to the permanent child record, not to the enrollment number. A transfer changes the number a parent types in, but the account, its history and its preferences carry across intact.

Parents are told when it changes

The old enrollment number stops working the moment a transfer completes. The notification module sends the new one automatically by WhatsApp and email, so a parent is never locked out without knowing why.

No separate student login

Access is entirely through the parent account. One fewer identity to manage, and one fewer set of credentials attached to a child.

One question left on this. With one account per child, a family with three children holds three sets of credentials. We would like to know whether a guardian may set the same password across their linked children, or whether each account stays fully independent. It affects how the switch between siblings actually feels day to day.
16, Front desk

The visitor register, read from your current screens

Taken from the screens you shared. The structure is already right, so we are keeping its shape: purpose of visit, whom to meet by role and department, visitor details with a photograph, and a slip with its own number and a permission trail.

Becomes a lead

Parent, admission enquiry

Registered at the desk, the Relationship Associate is notified, and the duplicate check runs before a lead is created.

No lead

Parent, meeting

An existing parent visiting a teacher or the office. Logged against the student.

No lead

Vendor

Company, purpose, person being met, vehicle number, gate pass issued.

Goes to HR

Candidate

Role applied for and interviewer. The assigned hiring executive is notified automatically.

What your current slip already does well

A unique slip number with date and time, the visitor marked verified or not verified, up to three visitors on one entry, remarks, whom they are meeting with the department, who gave permission, and a print action. All of it carries across.

Repeat visits are counted

A parent arriving a third time is flagged, because a family that keeps returning is either close to deciding or stuck on something worth knowing about.

Your own visit types and forms

You can add a visit type and decide what it asks for without a release from us. The same form builder later adds your own fields to leads, parents and students.

Sequencing. The full visitor module comes after the CRM and admission work. We are designing the handover from the front desk to the CRM now, so nothing has to be rebuilt when it arrives.
17, Partners and referrals

Partners work through their own link, with no login to manage

Friendship schools, daycares and corporates each get a private web address and a QR code. No account to create, no password to reset, no training required.

Referral types

Alumni, parent, guest and special case, each tracked separately so you can see which relationship actually produces admissions.

They send you leads

One at a time through their page, or in bulk by spreadsheet. Every lead arrives tagged to that partner and branch, and runs through the same duplicate check as any other source.

A fixed amount, per agreement

Each agreement records a fixed referral amount. No percentages. The system calculates what has been earned, and nothing about money appears on the partner page.

Links expire with the year

Partner links and QR codes are bound to an academic year and lapse with it. Head office keeps access at any time.

What a partner sees. Their link opens without a password, so the page shows a child's first name and a broad status only, with no phone numbers, no fee or concession detail and no counselling notes. A daycare is a commercial party, and their page should not become a record of what your school offered a particular family.
18, Scope

What this phase covers, and what waits

Being explicit so there is no gap between what you expect and what we build. Everything on the right is a real want we have heard, and each is separate work rather than something quietly included.

In this phase

Core platform. Organisation, country, company, business unit, branch, roles, permissions, masters, security, audit trail
Student identity. Permanent child record, enrollment history, sibling links, movement tracking
Sales and marketing. Leads, duplicates, two level sources, scoring, allocation, follow-ups, budgets, spend, targets, funnel reporting
Partners and referrals. Partner pages, bulk upload, agreements, fixed referral amounts, year bound links
Admission. Enquiry to enrollment, provisional admission, concession approvals, payment capture, receipts
Documents. Document master, unit mapping, checklist approval, digital signature, pending reminders
Movements. Rollover, unit transfers, branch transfers, cancellations
Communication. WhatsApp and email per business unit, templates with attachments, occasion based wishes including alumni
Parent app. Login by enrollment number, sibling and academic year switching

Later phases

Learning and training. Staff training built from performance, which needs the performance measures agreed first
AI assistance. Presentations per lead, weekly plan suggestions, counsellor and teacher coaching
One place for all communication. Internal messaging, parent raised tickets reaching the principal
Calls. Recording, transcripts, auto dialling, IVR
WhatsApp chatbot. Conversational replies, separate from template messaging
Devices. Biometric attendance, bus tracking, document scanning, DigiLocker
Remaining modules. Full finance and fee cycles, academics, HR, transport, library, inventory
On fees. Money collected during admission is included: the fee discussion, the concession approval, the payment, the post dated cheques or mandate, the receipt, and the approval trail behind a receipt cancellation. The ongoing fee cycle after a student joins, with dues, reminders and accounting, belongs to the finance work that follows. Student and finance data are backed up yearly to an address you nominate.
19, Over to you

Four questions left

Down from seven. The structural decisions are settled, and what remains is detail we would rather ask about than assume.

01

The exact grade list for each business unit

Now that a grade can belong to both units, we need your definitive list: which grades RPS runs, which RIS runs, and exactly where the overlap sits. This is the last thing standing between us and a final academic structure.

02

What "Rainbow Parent" means as a closure reason

It appears in your live tracker. If it means an existing family enquiring for a second child, that is a sibling admission and should follow a shorter path with the parent record reused, rather than being closed. We suspect this reason is covering for a flow that does not exist yet.

03

Which head office role verifies documents

You have confirmed final verification sits at head office. We need the role named and placed at an authority level, so it can be added to the role master and the approval matrix configured against it.

04

Sibling passwords

With one account per child, a family with three children holds three sets of credentials. May a guardian set the same password across their linked children, or does each account stay fully independent?

Two things that need someone on your side, not a decision from us. Your website team must pass campaign tracking values through on form submission, which cannot be added afterwards. And RPS and RIS each need a verified WhatsApp Business account with approved templates, both of which have a lead time before go-live.
EiosysWorli, Mumbai
Corrections welcome on every slide. That is what this document is for.
EiosysPrepared for Rainbow Group
1 / 20